Sor TA Nuclear Qualified Temperature Switch Manual do Utilizador Página 3

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 8
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 2
Form 655 (04.13) ©SOR Inc.
3/8
N6 Housing
Remote Mount
Direct Mount
Cover
Screws
1/8” NPT(F)
Vent
Connection
Body
Process
Connection
Sensing Bulb
3/4” NPT(F)
Conduit Connection
Mounting
Holes
Sensing
Bulb
1/8” NPT(F)
Vent
Connection
Process
Connection
Gland
Nut
Capillary
Cover Screws
Mounting
Holes
Retainer
3/4” NPT(F)
Conduit Connection
Mounting Hardware Fasteners per SOR Test Report 9058-102 consist of two 1/4-20,
Grade 5 screws (not supplied). Torque screws to 70 to 85 in-lbs.
Maintenance Replace cover gasket (SOR P/N 8923-180) whenever cover is removed or
minimum of once every 5 years, whichever comes first. Remove the four cover screws.
Remove the old gasket. Place new gasket between housing and cover. Line up holes in
cover, gasket and housing. Insert the 4 screws and torque each to 7 to 10 in-lbs.
Vista de página 2
1 2 3 4 5 6 7 8

Comentários a estes Manuais

Sem comentários